Groupe Ammar
Capacity
Output
Annual Reduction
As part of our collaboration with the Ammar Group in El Jadida, we completed the installation of an ON-GRID rooftop solar photovoltaic system. This project reflects the client’s commitment to significantly reducing their energy consumption and carbon footprint while promoting renewable energy within their industrial operations.
The installation reaches a total capacity of 849.6 kWp, made possible by the deployment of 1,440 Jinko Solar photovoltaic panels, each with a power output of 590 Wp. These modules, known for their reliability and high efficiency, were selected for their ability to maintain optimal performance under diverse climatic conditions.
To ensure efficient and stable energy conversion, the system is equipped with eight Huawei inverters, each with a capacity of 100 kW. These high-efficiency inverters provide continuous and secure power production, perfectly suited to the site’s industrial needs.
This achievement highlights our commitment to delivering high-performance and sustainable solar solutions that meet the technical and economic requirements of our partners. The Ammar Group project represents another step forward in our mission to support Moroccan companies in their responsible energy transition.