Compagnie industrielle de fibre Tanger
Capacity
Output
Annual Reduction
As part of our partnership with the Industrial Fiber Company in Tangier, we have successfully carried out a significant extension of their ON-GRID ground-mounted solar photovoltaic installation. This ambitious project aims to reduce the company’s energy consumption and carbon footprint while meeting its specific needs for renewable energy.
We increased the energy capacity of the existing installation from 2.7 MWp by adding 1.4 MWp, bringing the total power to 4.1 MWp. The installation includes 2,416 Trina Solar Dual Glass Bifacial photovoltaic panels, each with a capacity of 590 Wp, ensuring a power supply that meets our client’s industrial requirements.
To optimize energy conversion, we installed four Huawei inverters of 330 kW, connected to a step-up transformer that converts voltage from 800 V to 22 kV, integrated into the client’s medium-voltage loop. These components, recognized for their reliability and high efficiency, are perfectly suited to large-scale systems.
This project highlights our commitment to delivering sustainable and secure energy solutions that are perfectly tailored to the needs of modern industries.